What is control key in SAP PP?

What is control key in SAP PP?

Definition. The control key is a default value which defines how an operation should be processed. It is entered in the operation overview or on the detail screen for the operation. If a default value for the control key was specified in your system using the Customizing function, the system proposes this as the entry.

What is control key in Work Center SAP?

Control key assigned in the work center determines usage of the work center in the type of production (In-house/External). When the work center is assigned in a routing, it takes the control key by default which is assigned in the work center data.

What is the importance of routings in SAP?

Routine defines the list of activities to be performed for the production process. Routing defines a sequence of activities performed at the work center. Routing plays in important role in calculating production cost, machine time and labor time.

What does a work center control?

Work center consists of master data related to routing of products. It contains data related to scheduling, capacity planning, and production costing. All the manufacturing activities are performed in the work center. The work center can be used to monitor the following activities −

What is backflushing in SAP PP?

Backflushing is automatic accounting (Goods issues – 261 mvt) of material consumed for production, at the time of confirmation. Eg. When a 4 wheeler automobile is rolled out from assy line, 4 wheels & Tyres are deemed to be consumed and issued to production order automatically by way of backflushing by the system.

How do I change the control key in SAP?

Step 1: – Enter transaction code “OPSU” in the SAP command field and press enter. Step 2: – On activity control key screen, click on “New entries” to create new control keys as per requirements of a organization. Step 3: – On new entries activity control key screen, update the following fields.

What is group routing in SAP PP?

When you create a routing, you can assign it to a group. You combine routings in a group that describe. Similar production processes for different materials. Different production processes for the same material (for example for various lot-size ranges). Grouping helps you find routings later.

What is task list type in SAP PP?

Task list is a general term used in sap. In simple words it is the combination of sequential steps to perform a task. Task list types consists of Used in module. o routing SAP PP-Discrete mfg. o reference operation set SAP PP-Discrete mfg.

What are the available control key parameters?

We need to consider the most important parameters while creating a control key.

  • Capacity planning,
  • Costing.
  • external processing.
  • completion confirmation.

What is confirmation control key in SAP?

The confirmation control key governs whether confirmations are expected for specific purchase order items and whether these confirmations are relevant for goods receipt or materials planning.

What is meant by super routing in SAP?

If you create a Routing for a configurable material, it is called Super Routing. In that routing you will have rules that may or will have difference operations or operation parameters based on the configuration parameters.

What is the importance of routings?

It’s vitally important to the Internet and we tend to overlook it until something goes wrong. Routing determines how packets (data sent over a network or networks) containing information, like email messages, website data, and voice-over-IP (VoIP) calls, move from one place to another on the Internet.

What are the control keys in SAP pp?

Control keys are really important keys in SAP PP. A control key governs the following controls for a production order Routing: § Whether a work center at an operation should be scheduled. § Whether a work center at an operation should be subjected to cost derivations. § Whether a work center at an operation should derive the capacity requirements.

Can I use different control keys in work center and routing?

When the work center is assigned in a routing, it takes the control key by default which is assigned in the work center data. It is not advisable to use different control keys in work center and routing. Help to improve this answer by adding a comment.

What is the use of Control key in Defaut value keys screen?

Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings. Almost in all the PP we define same Control key to the work center as well in the routing. For example in work center control Key PP01 is used to define Routings/Internal proc. activities.

What is the use of Control key in PP PI?

Control key is used to define whatever the business transactions should be performed. 1) Configuration path for PP PI: SPRO -> IMG ->Production planning for process industries -> Master data -> Resource -> Master Recipe data -> Define control keys.